Peter is having a large conservatory built at the back of his Below is a plan of the project, showing when each part of the conservatory is to be built.
Each blocked square on the plan represents one man for one day.
The correct answer is D.
To find the maximum number of workers on site at the same time, look at the part of the plan where vertically (in a single column) there appears to be the most shaded blocks. This is on the columns representing both the 12th and the 13th of April, where there are 2 men for brickwork, 1 man for roof and 1 man for glass, so a total of 4 men. So we know our answer must be B or D. To work out how many days labour Peter will have to pay for, count how many shaded blocks there are on the entire plan, which is 58. Therefore the answer is D.